BidFirst Call us (209) 583-5459 Get your free takeoff

Commercial flooring takeoffs

A flooring takeoff measures every floor finish on the plans so you can price the bid. Send us the PDF set and we return marked-up plans and an Excel quantity sheet in 24 hours, guaranteed.

If you do the takeoffs at night after the job site, outsource flooring takeoffs to our US-based team and spend those hours bidding. Your first one is free, on a job you already measured or a new one you are bidding.

Sample apartment unit marked up by flooring material An architect's unit plan, 38 by 28 feet, with walls, windows, doors, kitchen casework, bath fixtures, closets, grid lines and dimensions. Marked up: LVT in the living area and hall, 453 SF. Carpet in two bedrooms, 51.33 SY net, seam dashed. Tile in the bath, 91.9 SF. 4 base cabinets and the tub hatched out as not counted. 22.8 LF of cove base. ABC 123 21'-6"16'-6"38'-0"15'-6"12'-6"28'-0"13'-6"14'-6"10'-0"11'-6"16'-6" CT REF W/D 1 A-401 UNIT PLAN B: FLOOR PLAN 1/4" = 1'-0" ON 24x36. REDUCED, USE GRAPHIC SCALE. 1,064 SF. 3BASE CABINETS, SEE A5.15SEE FINISH SCHEDULE74" RUBBER BASE9TUB AND SHOWER, SEE P-20112W/D BY OWNER 02468 FEET N 2341 W2W2W4 379125 1A5.1 LIVING101KITCHENBEDROOM 1102BEDROOM 2103BATH104HALL105CLCL LIVING AND KITCHEN LVT 309.25 SF HALL LVT 143.75 SF BATH TILE 91.9 SF BEDROOM 1 CARPET 24.75 SY BEDROOM 2 CARPET 26.58 SY

Sample unit, 1,064 SF

  • LVT 453 SF net
  • Carpet 51.33 SY net
  • Tile 91.9 SF net
  • Cove base 22.8 LF

Tap a material to see its numbers

A sample apartment unit, measured the way every takeoff comes back. LVT in the living area and hall, carpet in both bedrooms laid in 12 ft strips, tile in the bath.

Measured to your commercial scope

Tell us which buildings or floors you are bidding and anything the GC carved out. We measure that scope.

Our sample unit plan marked up by material: LVT filled in brown in the living area and hall, carpet in purple in both bedrooms with the seam dashed at 12 ft, tile in teal in the bath, cabinets and tub hatched out as not counted, cove base dashed in pink, and a notes box listing each finish with its quantity
Our sample unit, marked up by material the way your plans come back.

On a commercial set, the finish schedule and the plan notes decide which material goes in which room. We read both before we measure. Where the schedule disagrees with the drawing, the schedule wins and we flag it.

The marked-up PDF shows what we measured and where, color coded by material, so you can check our scope against yours before you bid.

See every file from the sample job

  • Your PDF set marked up in color by material, so you can see what we measured and where.
  • An Excel sheet with every quantity by room and by material.
  • Every floor on the plans in the unit you buy it in, like LVT in square feet, carpet in square yards and tile by size.
  • Cove base in linear feet, and a count of transitions at each material change.
  • Net and order quantities, with the waste factor on every line.
  • Seam layouts for roll goods, with the cut list you order from.
  • A written list of every assumption we made, plus any questions for you to confirm.
  • On apartment jobs, each unit type taken off and totaled for the building. See multifamily takeoffs by unit type.

How we measure your plans

We read the finish schedule and the plan notes before we measure anything.

The sample Excel quantity sheet: net, waste and order for LVT, carpet, tile, cove base, transitions, countertop and cabinets
The sample quantity sheet these rules produce.
  • LVT by room and schedule

    You get the square feet of LVT in each room, checked against the finish schedule, with the order rounded up to full boxes. It stops at the cabinet toe kick, and nothing is counted under base cabinets or the tub and shower. More on LVT takeoffs.

  • Carpet in square yards

    Carpet is laid out on 12 ft rolls with no quarter-turning inside a room. You get the net square yards and the yards to order from the cut list.

  • Tile by size, with cuts

    Floor tile is taken off by tile size, and the waste allows for cuts at walls, tubs and doorways.

  • Every other floor

    Hardwood, laminate, VCT, sheet vinyl, rubber, linoleum, terrazzo, epoxy, polished concrete and sports floors are measured room by room against the finish schedule, with net, waste and order on the line.

  • Cove base without doors

    Cove base is measured in linear feet along the walls it runs on. Door openings are taken out.

  • A transition at each change

    Every change of material gets a transition, like LVT to carpet at a bedroom door or LVT to tile at the bath.

  • Plan notes win

    When a note or the finish schedule disagrees with the drawing, the note wins. Anything unclear goes on a list of questions for you to confirm.

Questions about takeoffs

What flooring do you measure?

Every kind of flooring: carpet and carpet tile, LVT and LVP, VCT, sheet vinyl, rubber, linoleum, laminate, hardwood and engineered wood, ceramic, porcelain and stone tile, terrazzo, epoxy and resinous floors, polished concrete, sports floors, cove base, transitions and stair treads. Countertops, cabinets and wall tile can be added for 1 credit.

What do I need to send?

The project name, city and GC, the PDF plan set and the scope you are bidding. If you have the finish schedule, addenda or your own waste factors, send those too.

How do I check your numbers?

Send a job you already measured as your free first takeoff. Once our files are back, send your numbers and our lead estimator shows you every line where we differ on a 15-minute review call. How the free takeoff works

Other flooring services

All flooring estimating services Pricing and credits

A US tape measure laid across a wood floor at the 16 inch mark

Send us a job

Your first takeoff is free. Send one you already measured and see our numbers side by side with yours, or a new one you're bidding. We measure it without seeing your numbers and your files come back in 24 hours. Then our lead estimator goes through it with you on a 15-minute review call.

Plan changes and anything we missed are fixed free, every time, on the same project.